Christ the King Centre for Learning secondary school in Knowsley, Merseyside

Christ the King Centre for Learning secondary school in Knowsley, Merseyside

Guidance report: secondary schools

The first Target Zero guidance report on a secondary school building has now been produced.

The Target Zero School is based on a recently constructed building, Christ the King Centre for Learning secondary school in Knowsley, Merseyside. The key findings from the report are:

  • The steel composite structure had a 14% lower embodied energy content than the alternative in situ reinforced concrete flat slab structure;
  • The likely 2010 Part L compliance target of reducing operational carbon emissions by 25% is achievable using energy efficiency measures alone and without any appreciable additional capital costs;
  • The most cost-effective routes to true zero operation is to use a combination of on-site energy efficiency measures along with off-site and on-site LZC technologies.
Download report (PDF)

REGISTER HERE for notification when future publications become available

More…

Contact us

Call the Target Zero Information Line
+44 (0)1709 82 55 44 or email us at
.(JavaScript must be enabled to view this email address) or complete an enquiry form